• News & Events
  • Careers
GRIDiant Corporation
  • Home
  • About Us
    • Company Overview
    • GRIDmaster Value
    • Management Team
    • Board of Directors
  • Products
  • Partners
  • Case Studies
    • PEPCO
    • Southern California Edison
    • SMUD
    • Silicon Valley Power
    • PG&E
    • CAISO
    • Power Plant Siting
  • Contact Us

PEPCO

  • Developed Detailed Electrical Model (DEM) of PHI 4-substation, 8-feeder Distribution system (test bed for “Distribution Automation” system)
  • Demonstrated GRIDfast’s ability, in immediate post-fault (including multiple fault) conditions, to identify specific measures with which PHI could optimize rapid restoration of service where Automatic Sectionalization & Restoration system did not do so.
  • Demonstrated potential PHI improvement in reliability indexes (SAIDI and SAIFI) for subject system by:
    1. Evaluating and quantifying bus-level stresses before and after a fault,
    2. Determining optimized system controls, and
    3. Identifying optimal shedding of specific loads using load curtailment to meet PHI-prescribed system performance and service objectives
  • Please note that AEMPFAST now is branded “GRIDfast”, and is owned and developed by GRIDiant Corporation.
Click Here for Case Summary (PDF)

Most Recent Posts

  • GRIDiant at Distributech 2012 – January 24 – 26, San Antonio, Texas
  • GRIDresponse Demo Video
  • GRIDiant Launches Intelligent Demand Response Software for the Smart Grid
  • GRIDiant Announces Release of GRIDresponse
  • GRIDfast is now IBM SAFE Validated

We’re Proud to Work With:

Copyright (c) 2012 GRIDiant Corporation All Rights Reserved.